Wonsail New Materials  Technology Co., Ltd

Wonsail New Materials Technology Co., Ltd

Shengfan GFRC production process

2021 11/15

GRC(GFRC) production process mainly has the following six steps :
1. computer programming
2.Engraving machine engraving mold
3. Mold assembly production
4. Production of the product
5. Product stripping maintenance

6. Product packaging transport


.Computer Programming:Factory carving master according to CAD drawings, in accordance with the requirements of customers and drawings marked above the size of the preparation of computer programs.Need to carve the general are the shape of the site, can not use the plate to achieve the site.

146018530714

.Engraving machine engraving mold : The engraver to write a good program into the computer, three-dimensional CNC engraving machine began to automatically engrave the mold.General carving materials are mainly wood, gypsum, foam.

146018542583

.Mold assembly production
The basic process of mold making is as follows :
1.Line---
2.Open material---
3.Set the table---
4.Fill ash mold, paint---
5.Binding---
6.To QC ---

146018551741


.The type of mold:
1. Wood mold --- the number of use, can be directly made of wood negative mold (using 20-50 times)
2. Silicone mold --- cost expensive, mainly used for carving, easy stripping (using 20-30 times)
3. FRP --- the use of more than the cost of wood than your (use 100-200 times)
4. Gypsum mold --- use less (use 2-3 times)
5. Cement mold

146018558526



.Product jet production : GRC produ ction process there are two, one is the hand paste process, the other is the spray process.I produced all the products, all of the spray process production.The spray process is the GRC industry standard designation process.The quality and strength of the products produced by the spray process are several times or even several times more than the hand-paste process.
The main steps of the spray process are as follows :
1.Cleaning mold
2.Playing off the oil
3.Open material
4.Sprayed
5.Back light

146018558526



.Product stripping maintenance : GRC products after stripping, in accordance with the process requirements, need to maintain 28 days before they can achieve its maximum strength.Under normal circumstances, the factory can be shipped seven days.
146018563099


Product packaging Transport : All the products of the factory need to be well packed.First with wrapping paper to packaging, the external also need to use wood to reinforce.There are two kinds of land transport and sea transport.If conditions and duration allow, preferred sea transport. Conditions are not allowed to choose land transport.